Completed projects > Roads & infrastructure
![UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION FROM KUNDAL, JHADOL](https://www.uniqueinfra.in/wp-content/uploads/2023/04/jhadol-nh-156-4-1024x768.jpeg)
UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION FROM KUNDAL, JHADOL
COMPLETED PROJECTS > ROADS AND INFRASTRUCTURE Completed Projects Upgradation to two lane with paved shoulder configuration from kundaljhadol (section of NH -58E) From km 22+000 to km 25+000(Design chainage) Description 3 km for H.G Infra Ltd. Rajasthan Scope of Work Earth work, embankment, sub grade
![SIX LANING OF NH-8 IN STATES OF RAJASTHAN & GUJARAT](https://www.uniqueinfra.in/wp-content/uploads/2023/04/kaya-nh-8-5-1024x768.jpeg)
SIX LANING OF NH-8 IN STATES OF RAJASTHAN & GUJARAT
COMPLETED PROJECTS > ROADS AND INFRASTRUCTURE Completed Projects Six laning of NH-8 in states of Rajasthan and Gujurat (Approx length 113.8 km) on DBFOT (Toll) under NHDP Phase V(Package -V) for IRB infrastructures Ltd. Rajasthan and Gujurat(From- 337+600km to 338+585km) Description 113.80 Km Scope of Work Earth work, embankment, sub grade